Manufacturer since 2015Shanghai, ChinaCE · RoHS
+86 156 1820 3882ny@ny-cable.com
Request a quote
Home › Products › Reeling cable
Coiling and payout

Reeling Cable for Drum, Reel and Festoon Systems

Cable that winds onto a drum or reel. A tensile member and anti-torsion lay carry the winding load — the load a drag chain construction is not built for.

1 kVMax rated
Anti-torsionLay
100 mMOQ
5-7 dLead time
Reeling cable for drum and reel systems
Reeling cable, tensile construction
Construction

Reeling cable — specification

Winding puts two loads on a cable that a linear application never sees: tension along the axis, and torsion as each layer crosses the one below. Reeling cable is built for both — a tensile member takes the axial load and the lay is arranged so the cable does not corkscrew as it spools. Using drag chain cable on a reel is the most common cause of conductor breakage in hoists and festoon systems.

ParameterValue
Rated voltageup to 1 kV
Conductortinned copper
Jacket optionsnitrile (NBR) / polyurethane (PUR)
Constructiontensile member with anti-torsion lay
Operating temperature, PUR-40 to +80 °C
Operating temperature, NBR-15 to +70 °C
Standard basiscustomer specification
Minimum order100 m

Where it is used

Winding, spooling and payout duty.

Cranes and hoists
Port and shipyard equipment
Mining machinery
Cable reels and festoons
Lifting and stage equipment
Container handling

Common questions

Reeling cable buying questions.

What is the difference between reeling cable and drag chain cable?

Drag chain cable suits linear reciprocating flexing inside a carrier and is optimised for bend life. Reeling cable winds onto a drum or reel, so it must also carry tensile load and resist torsion. Using one in the other's duty cycle is the most common cause of premature cable failure.

What voltage range is available?

Any construction in the range up to 1 kV. Higher voltages are quoted as a separate construction rather than as a variant of a standard item.

Can you supply a custom core count?

Yes. Core count, cross-section and the number of control or signal pairs are specified per order, from 100 m.

Send the duty cycle, environment and voltage. We return a construction proposal.

MOQ 100 m · standard lead time 5-7 days · CE and RoHS documentation